Atlas Manufacturing operated three precision engineering plants with 14.2% unplanned downtime costing £4,800 per hour. Supplier POs took 3.2 days manually. Quality defects were found after full production runs. Reporting consumed 11 hours per plant manager weekly.

We deployed five automation pipelines across all three plants in 22 days. Unplanned downtime fell from 14.2% to 4.1%, OEE improved from 68% to 84%, scrap rate dropped 63%, and £1.8M in annual savings was verified at day 90.